Strange recent activity

When I went to resume this morning I noticed that there was some strange activity with my Repls. I have been working on day 76 and 77 but there are several other Repls at the top saying ‘edited’. How can this happen?

Does anyone else have access to them?

Hi @MichaelDaburn ! Did you enter them previously to check something or copy some code? Something that won’t edit the code, but will allow Replit to realise that it was recently entered.

No, I’m the only person with access to my account.

Not to my recollection, besides I was using 76 and 77.

Ok, has anything changed in the projects that claim to have been edited?

I have local copies so I’ll check at some point. Maybe a pw change is due :confused:

Yeah, a password change is probably not a bad idea.